Smith
/ Under Construction
This two-storey Highgate home showcases thoughtful construction and design. The ground level features cavity brickwork and face brickwork, ensuring a solid foundation for the second storey. The upper floor walls and roof are built using steel framing and trusses, offering both cost savings and quicker construction times.
Currently under construction, this home is set for completion in early 2025.


